| |

| |

The project’s total cost is estimated to be approximately $70 million, including construction of a new fluidized-bed boiler, emissions control systems, a covered wood-chip storage facility, a wood unloading and handling system, and a covered conveyor to deliver chips to the boiler.
< Back to FAQ list | |